awt3016f-shotcrete-machine-thailand-delivery.jpg
2025-05-09
AWT3016F Shotcrete Spraying Machine Shipped to Thailand

We are pleased to share that our AWT3016F Shotcrete Spraying Machine has been successfully shipped to a valued customer in Thailand. This shipment further reinforces our commitment to supporting infrastructure development in Southeast Asia. About AWT3016FThe AWT3016F is a high-performance wet-mix

View More
Aivyter_90kW_Screw_Compressor_TTCL_PSA_Project_Thailand (2).png
2025-04-23
TTCL PSA Nitrogen Project in Bangkok, Thailand

As energy efficiency, automation, and reliability become top priorities in industrial development worldwide, the demand for high-performance compressed air systems is rising rapidly. Recently, Aivyter’s 90kW screw air compressor was successfully deployed in the TTCL PSA nitrogen generation project i

View More
微信图片_20241104104710.jpg
2025-04-08
Batang, Sichuan – Tunnel Construction Project Powered by 250kW Mobile Air Compressor

In March 2025, AIVYTER’s 250kW mobile screw air compressor was deployed to a tunnel construction site in Batang County, Sichuan Province, supporting infrastructure development in one of China's most challenging high-altitude regions.Reliable Performance in Demanding ConditionsBatang is located in th

View More
Aivyter-Shotcrete-Spraying-Machine-AWT20-Tunnel-Concrete-Spraying-01_compressed.jpg
2025-03-31
Zijing Tunnel Project – Sichuan Road & Bridge Group

Application of Shotcrete Spraying Machine in Tunnel and Underground EngineeringProject BackgroundIn the Sichuan Road & Bridge Zijing Tunnel Entrance Project, to ensure construction safety and efficiency, Aivyter Shotcrete Spraying Machines (AWT20 and AWT3016F) along with intelligent air compressors

View More
hubei-ccseb-tunnel-project-air-compressor.jpg
2025-03-28
Energy-Efficient Air Compression Solution – Hubei China Communications Second Navigation Engineering Bureau Tunnel Project

Project Overview: Tackling High Energy Costs in Long TunnelsHubei Communications Investment Group. faced significant energy challenges during a critical tunnel construction project:Equipment Load: 7m³ dry-shotcrete machine + 11 pneumatic rock drills, requi

View More
xinjiang-tianshan-victory-tunnel-project03.jpg
2025-03-18
Xinjiang - Tianshan Shengli Tunnel Project

Project Overview Location: Xinjiang, Wuwei Expressway, Tianshan Shenli Tunnel Altitude: 2,700 metersTunnel Type: Two-lane highway tunnel Total Length: 22,000 meters Project RequirementsTo ensure efficient excavation, multiple air compressors were deployed along the tunnel. The goal was to provide suffi

View More
chongqing-tunnel-project-air-compressor-renovation03_compressed.png
2024-11-19
Chongqing - Tunnel Energy-Saving Renovation Project

Project OverviewLocation: ChongqingProject Type: Tunnel ConstructionPrevious Equipment: Traditional Two-Stage Screw Air Compressors (Ordinary Compressors)Issues Identified:High energy consumption due to full-pressure operation with 132KW motors.Frequent no-load or light-load operation resulting in e

View More

Newsletter

We will reply to you as soon as possible.
Aivyter is a professional enterprise
engaged in the research, development, sale and service of drilling jumbo, shotcrete spraying machine, screw air compressor and relative equipment for the engineering construction and mining.
Leave a Message
Contact us

QUICK LINKS

PRODUCTS

CONTACT US
  +86-591-83753886
   sale@aivyter.com
   No.15, Xiandong Road, Wenwusha Town, Changle District, Fuzhou City, China.
Copyright © 2025 Fujian Aivyter Compressor Co., Ltd. All rights reserved.  Supported by leadong.com    Sitemap     Privacy Policy